we had an intership students in school and we had the opportunity to make a concrete installation in buea.
the priority was:
the calculations were not so easy to make an installation for 2 purposes: water and house. at the end we could install the water pump the inverter was working with 2 battery carbon lead of 12 volts each we had difficultiy with the controller for the house. it is showing one more time, that the installation of the panels on the roof is the most difficult part